| |
|
|
![]() |
The deck got finished in May, 2000. Substructure is old wood from neighbor's barn that was taken down. The surface is spruce. The curved walk leads to parking; the straight walk leads to what will be the sunken garden in the old barn foundation. The beam across the top will have a grape vine on it. |